Self-consumption managed by EMS Board

Installation and configuration of a photovoltaic self consumption system with batteries

Link to document

Detailed wiring diagrams

TT Grounding Systems: Link to document
TN Grounding Systems: Link to document

Practical example:

01. INTRODUCTION to Self Consumption systems managed by the INGECON SUN EMS Board.
Duration: 5 mins and 10 seconds.

02. ELECTRICAL CONNECTIONS to the INGECON SUN STORAGE 1Play.
Duration: 8 mins and 20 seconds.

03. INGECON SUN EMS Board CONNECTION including all its components.
Duration: 11 mins and 44 seconds.

04. CONFIGURATION through the display and INGECON SUN EMS Tools.
Duration: 13 mins and 14 seconds.

05. FINAL COMPROBATION of the complete system.
Duration: 2 mins and 47 seconds.

Additional information:

BYD Battery-Box H6.4 on a self consumption systems managed by the INGECON SUN EMS Board.
Duration: 20 mins and 11 seconds.

FREEDOM WON Lite HV Series on a self consumption systems managed by the INGECON SUN EMS Board.
Duration: 18 mins and 36 seconds.